Live financial news intelligence

Track market-moving stories before they get noisy

Real-time pulse of financial headlines curated from 5 premium feeds.

Latest market signal Czech Filtered by asset AG
Coverage 92,269 Raw stories ingested 7,951 rewritten in CS_CZ • 0 to rewrite (last 2 days).
Agents 7 waiting Pipeline agents
  • FMP Stock News Fetch every minute 55s ago
  • FMP Forex News Fetch every 5 min 3m ago
  • CoinGecko News Fetch every 5 min 3m ago
  • FIO Stock News Fetch every 10 min 2m ago
  • Patria Stock News Fetch every 10 min 2m ago
  • Editorial rewrite Rewrite every minute 55s ago
  • Asset sync Assets every 1 hour 32m ago

Latest coverage

Market News Feed

Scan headlines quickly, then expand any story for source context.

View
Language
Relevance
Clear
Details Date Content Source Relevance
2026-07-09 16:15 16d ago
2026-07-09 11:26 16d ago
First Majestic zvýšila výhled produkce pro rok 2026
AG First Majestic Silver
FMP Stock News 86
Original source text
Key Takeaways First Majestic raised its 2026 silver and gold production guidance after a stronger first half.AG's Q2 silver production rose 3% y/y, led by gains at La Encantada and Santa Elena.First Majestic hiked its 2026 guidance for San Dimas, Los Gatos, La Encantada and Santa Elena. First Majestic Silver Corp. (AG - Free Report) announced that its silver production reached 3.8 million ounces in the second quarter of 2026, marking a year-over-year increase of 3%. The upside was driven by solid performances at the La Encantada and Santa Elena mines. The company’s gold production also increased 2% year over year to 34,660 ounces.

First Majestic also produced 16.5 million pounds of zinc, 9 million pounds of lead and 252,938 pounds of copper.

First Majestic’s Mine Performances in Q2In the second quarter of 2026, the San Dimas mine produced 1.06 million ounces of silver, marking a 15% decrease from the second quarter of 2025. The mine’s gold production fell 1% year-over-year to 12,385 ounces. The downside was led by a delay in mine haulage.

The Santa Elena mine produced 422,571 ounces of silver (up 38% year over year) and 21,468  ounces of gold, which increased 4% year over year.

La Encantada produced 1.03 million ounces of silver, up 65% from the second quarter of 2025. The upside was driven by 14% growth in ore processed and a 27% increase in silver grades.

Los Gatos contributed 1.28 million ounces of silver and 772 ounces of gold. It also contributed 16.4 million pounds of zinc, 9 million pounds of lead and 235,886 pounds of copper to First Majestic’s total production number.

First Majestic has started its 2025 drilling program at the Jerritt Canyon mine in the third quarter of 2025. The company completed 12,495 meters of surface drilling using two reverse circulation rigs, alongside about 320 meters of underground drilling with a single diamond rig during the second quarter.

AG’s Updates 2026 GuidanceFirst Majestic expects gold production of 72,000-76,000 at the Santa Elena mine, marking an increase of 10% at the mid-point from the previous guidance. The upside will be driven by higher gold grades and slightly increased gold recoveries. The mine’s silver output is projected between 1.4 million and 1.5 million ounces, revised to be near the upper limit of the company's initial forecast.

The company’s Los Gatos mine is expected to produce 5.1-5.5 million ounces of silver in 2026, marking a 5% increase at the mid-point from the previous guidance. In contrast, the La Encantada mine’s silver guidance is expected to increase 19% at the midpoint from the previous guidance to 3.4-3.6 million.

San Dimas’s production is expected to increase 13% at the mid-point from the prior guidance to 4.6-4.9 million ounces of silver for 2026. The upside will be driven by higher throughput rates.

Driven by the strong first-half performance, the company hiked its production outlook for 2026. It expects the total silver production to be 14.6-15.5 million ounces, marking a 10% increase from the previous guidance of 13-14.4 million ounces. Total gold production for 2026 is expected to be 128,000-135,000 ounces, up 7% at the mid-point from the previous forecast.

First Majestic’s Peer Performance in Q4Endeavour Silver Corp. (EXK - Free Report) produced 1.94 million ounces of silver in the second quarter of 2026. This reflected a 31% increase from the year-ago quarter, driven by the addition of the Kolpa operation in May 2025. Endeavour Silver’s total gold production in the quarter grew 35% year over year to 10,474 ounces. The company’s silver-equivalent ounces production increased 36% year over year in the quarter.

AG Stock’s Price PerformanceThe company’s shares have skyrocketed 87.8% in the past year compared with the industry's 72.5% surge.

Image Source: Zacks Investment Research

First Majestic’s Zacks Rank & Stocks to ConsiderAlbemarle has an average trailing four-quarter earnings surprise of 74.5%. The Zacks Consensus Estimate for the company’s 2026 earnings is pegged at $12.45 per share, indicating year-over-year growth from a loss of 79 cents. ALB shares have skyrocketed 124% so far this year. 

Avino Silver has an average trailing four-quarter earnings surprise of 125%. The Zacks Consensus Estimate for Avino Silver’s 2026 earnings is pegged at 39 cents per share, indicating 34.5% year-over-year growth. Its shares have surged 62.7% in a year.
2026-07-07 21:07 18d ago
2026-07-07 16:36 18d ago
First Majestic prodává důl San Martin za 90 milionů USD
AG First Majestic Silver
FMP Stock News 86
Original source text
Vancouver, British Columbia--(Newsfile Corp. - July 7, 2026) - First Majestic Silver Corp. (NYSE: AG) (TSX: AG) (FSE: FMV) (the "Company" or "First Majestic") is pleased to announce that it has entered into a definitive agreement (the "Agreement") dated July 6, 2026 to sell its 100%-owned past producing San Martin Silver Mine located 250 kilometres north of Guadalajara city in Jalisco State, Mexico, in the San Martin de Bolaños mining district, ("San Martin"), to Flextronics Supply and Service, S. de R.L. de C.V ("Flextronics"), a private Mexican company, for total cash consideration of US$90 million (the "Transaction"), comprised of upfront consideration of US$2.5 million payable upon closing of the Transaction (US$500,000 of this amount has already been deposited into escrow as a deposit), and an additional US$87.5 million in future payments.

TRANSACTION DETAILS

The Agreement provides that, subject to satisfaction and waiver of certain conditions described below, Flextronics will acquire all of the issued and outstanding shares of Minera El Pilon, S.A. de C.V. ("El Pilon"), a wholly-owned subsidiary of First Majestic incorporated under the laws of Mexico that holds a 100% interest in San Martin. The acquisition also includes the Jalisco Group of Properties, consisting of 5,245 hectares of mining concessions owned by El Pilon, and located in the municipalities of Etzatlán and Tototlán, Jalisco. In exchange, Flextronics is required to make the following payments to First Majestic:

US$2.5 million in cash at closing (US$500,000 of this amount has already been deposited into escrow as a deposit);US$2.5 million in cash within 180 days of closing; US$10 million in cash on each anniversary date of closing, commencing on the first anniversary of closing and continuing each subsequent anniversary thereafter until and including the fifth anniversary date of closing (by which time, a total of $US50.0 million in anniversary payments would have been paid);US$35.0 million on August 31, 2032.Closing of the Transaction is subject to customary closing conditions, as well as Mexican Antitrust approval. First Majestic anticipates that the Transaction will close in the fourth quarter of 2026.

The San Martin Silver Mine is a past producing silver and gold operation that was placed under care and maintenance by First Majestic in July 2019. Flextronics is part of Meridian Capital, a diversified investment group focused on the mining and oil & gas sectors, with development projects across Mexico, including Sonora and Sinaloa, as well as in Venezuela and Uruguay.

ABOUT FIRST MAJESTIC

First Majestic is a publicly traded mining company focused on silver and gold production in Mexico and the United States. The Company presently owns and operates four producing underground mines in Mexico: the Santa Elena Silver/Gold Mine, the Los Gatos Silver Mine (the Company holds a 70% interest in the Los Gatos Joint Venture that owns and operates the mine), the San Dimas Silver/Gold Mine, and the La Encantada Silver Mine, as well as a portfolio of development and exploration assets, including the Jerritt Canyon Gold project located in northeastern Nevada, U.S.A.

First Majestic is proud to own and operate its own minting facility, First Mint, LLC, and to offer a portion of its silver production for sale to the public. Bars, ingots, coins and medallions are available for purchase online at www.firstmint.com, at some of the lowest premiums available.

FIRST MAJESTIC SILVER CORP.

"signed"

Keith Neumeyer, CEO

Cautionary Note Regarding Forward Looking Statements

This news release contains "forward‐looking information" and "forward-looking statements" under applicable Canadian and U.S. securities laws (collectively, "forward‐looking statements"). These statements relate to future events or the Company's future performance, business prospects or opportunities that are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management made in light of management's experience and perception of historical trends, current conditions and expected future developments. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives or future events or performance (often, but not always, using words or phrases such as "seek", "anticipate", "plan", "continue", "estimate", "expect", "may", "will", "project", "predict", "forecast", "potential", "target", "intend", "could", "might", "should", "believe" and similar expressions) are not statements of historical fact and may be "forward‐looking statements". Forward-looking statements include, but are not limited to: completion of the Transaction; all future payments due after closing of the Transaction; the satisfaction and waiver of certain closing conditions, including the receipt of Mexican Antitrust approval and the timing for such approval; and the expected timing of closing of the Transaction. These statements are based on the Company's assumptions that all conditions to closing of the Transaction will be satisfied in a timely manner. These assumptions may prove to be incorrect and actual results may differ materially from those anticipated. Actual results may vary from forward-looking statements.

Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause actual results to materially differ from those expressed or implied by such forward-looking statements, including but not limited to: risks related to the parties' ability to satisfy the conditions of closing of the Transaction, as well as those factors discussed in the section entitled "Risk Factors" in the Company's most recent Annual Information Form for the year ended December 31, 2025 filed with the Canadian securities regulatory authorities under the Company's SEDAR+ profile at www.sedarplus.ca, and in the Company's Annual Report on Form 40-F for the year ended December 31, 2025 filed with the United States Securities and Exchange Commission on EDGAR at www.sec.gov/edgar. Although First Majestic has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. The Company believes that the expectations reflected in these forward‐looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward‐looking statements included herein should not be unduly relied upon. These statements speak only as of the date hereof. The Company does not intend, and does not assume any obligation, to update these forward-looking statements, except as required by applicable laws.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/304329

Source: First Majestic Silver Corp.

Ready to Announce with Confidence? Send us a message and a member of our TMX Newsfile team will contact you to discuss your needs.

Contact Us
2026-06-25 21:43 1mo ago
2026-06-25 16:15 1mo ago
First Majestic získala povolení pro Santo Niño a Navidad
AG First Majestic Silver
FMP Stock News 86
Original source text
Infill drilling at Santo Niño and Navidad returns multiple significant silver and gold intercepts, including high-grade results from resource-conversion drilling.

Permits received for construction of the Santo Niño and Navidad portals.

Additional $12 million investment planned in 2026 to advance underground access and position Santo Niño for near-term mining.

Vancouver, British Columbia--(Newsfile Corp. - June 25, 2026) - First Majestic Silver Corp. (NYSE: AG) (TSX: AG) (FSE: FMV) (the "Company" or "First Majestic") is pleased to announce positive infill drilling results from the Santo Niño and Navidad targets at its Santa Elena Silver/Gold Mine in Sonora, Mexico. The Company has also received the permits required to construct the Santo Niño and Navidad portals and plans to invest an additional $12 million in 2026 to advance underground access, portal construction, and development work intended to position Santo Niño for near-term mining.

"The continued advancement of Santo Niño and Navidad marks an important step in unlocking the next phase of growth at Santa Elena," stated Keith Neumeyer, CEO of First Majestic. "Infill drilling continues to return significant silver and gold intercepts at both targets. With construction permits now received for the Santo Niño and Navidad portals, and an additional $12 million investment planned in 2026, we are moving Santo Niño from discovery toward near-term mining readiness while continuing to advance Navidad, one of the most significant discoveries made at Santa Elena to date. Together, Santo Niño and Navidad are expected to become important contributors to the future mine plan and have the potential to materially extend Santa Elena's mine life."

2026 EXPLORATION HIGHLIGHTS

Santo Niño Vein System

To date, a total of 26,904 metres ("m") of drilling has been completed across 69 holes in 2026 at Santo Niño as part of the Company's ongoing resource-conversion and development-focused drilling program. Drilling at Santo Niño has focused primarily on infilling the current Inferred Mineral Resources to support potential conversion to Indicated Mineral Resources and to advance near-term mine planning. Results received to date include significant silver and gold intercepts that are overall better than modeled and confirm the presence of higher-grade mineralization in the western portion of the vein.

Navidad Vein System

To date, a total of 7,704 m of drilling has been completed across 10 holes at Navidad in 2026. Drilling has focused primarily on supporting potential conversion of Inferred Mineral Resources to Indicated Mineral Resources at the Winter vein which, based on its geometric configuration, is expected to play an important role early in the future mine schedule. Results received to date include high-grade silver and gold intercepts near the edge of the current Inferred Mineral Resource.

Figure 1: Santa Elena District Map Highlighting Santo Niño and Navidad Target Areas. Plan View.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/1475/302888_5632c92074479b28_002full.jpg

KEY DRILLING HIGHLIGHTS

Table 1 presents a selection of significant silver and gold drill hole intercepts from the 2026 Santa Elena drilling program at Santo Niño and Navidad. The selected intercepts include results from resource-conversion drilling at the Santo Niño vein and the Winter vein at Navidad.

Table 1: Selection of Significant Drill Hole Intercepts from the Santa Elena 2026 Drill Program

 Drillhole  Target    Significant Intercept  From
(m)  To
(m)  True Width
(m)   Ag
 (g/t)   Au
 (g/t) AgEq
(g/t) Santo Niño Target SE-26-84Santo Niño Vein 229.35234.153.682528.46 886SE-26-76Santo Niño Vein 203.70216.905.58905.23 482SE-26-65Santo Niño Vein 197.35204.055.801114.04 414SE-26-86Santo Niño Vein 339.15341.201.5733315.21 1474SE-26-82Santo Niño Vein 365.35377.9010.87771.52 191Navidad Target  EWUG-26-089Winter Vein562.65565.302.4935923.592128 EWUG-26-091Winter Vein601.65617.5014.89283.5291 EWUG-26-088Winter Vein600.15605.003.4335811.99 1257Drilling remains ongoing at the Santo Niño and Navidad targets. At Santo Niño, drilling is being completed as part of a planned program of approximately 45,000 m in 2026. At Navidad, drilling is being completed as part of a planned program of approximately 17,000 m in 2026. The drilling is intended to increase data density, improve understanding of the mineralized volume, grade continuity, and vein geometry, and support potential conversion of Inferred Mineral Resources to Indicated Mineral Resources. This work is expected to strengthen geological confidence and support the basis for underground access design, mine planning, production scheduling, and economic evaluation.

Significant silver and gold mineralization intersected within the Santo Niño vein currently extends approximately 1,100 m along strike and 425 m down dip and the mineralization averages approximately 4.0 m in thickness ranging from 1.0 m to 16.0 m (Figure 2). Mineralized secondary veins and breccias in the hanging wall and/or footwall of the principal vein have also been identified in several drill holes and remain under investigation.

Figure 2: Santo Niño Vein Long Section Looking North with Significant Intercepts

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/1475/302888_5632c92074479b28_003full.jpg

Significant silver and gold mineralization intersected within the Winter vein currently extends approximately 1,000 m along strike and 350 m down dip, with true thickness ranging from 2.8 m to 4.4 m (Figure 3). The 2026 drilling continues to support evaluation of the Winter vein as a potentially important early mining area within the Navidad mineralized system.

Figure 3: Winter Vein Long Section Looking Northwest with Significant Intercepts

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/1475/302888_5632c92074479b28_004full.jpg

ADVANCING UNDERGROUND ACCESS TO SANTO NIÑO AND NAVIDAD

The Company is advancing Santo Niño and Navidad from resource definition toward underground development, supported by recently received portal construction permits and an additional $12 million investment planned for 2026. This next phase of work is expected to establish dedicated underground access to both areas, support decline and ramp development, and position higher-grade mineralization from Santo Niño and Navidad to contribute to the future Santa Elena district production profile.

A recently completed scoping-level study identified dedicated underground access as the preferred approach to advance the Santo Niño and Navidad mineral resources. At Santo Niño, the preferred access concept includes a dedicated portal, the Santo Niño portal, and an approximately 450 m haul road connecting the portal area to the existing Ermitaño haul road.

The study also indicates that development of an additional portal, the Navidad portal, located approximately 300 m from the Santa Elena processing facilities, together with ramp development from the lower levels of Ermitaño to provide secondary egress and ventilation, is expected to provide an efficient route to Navidad mineralization and support future haulage of mineralized material from the Navidad area (Figure 4).

Preliminary mining and processing schedules for the Santa Elena district resources indicate that higher-grade mineralization from Santo Niño and Navidad has a positive impact on production profiles, displacing lower-grade mineralization from other deposits.

The additional 2026 funding is planned to support construction of the Santo Niño and Navidad portals, advance hydrogeological studies, construct the haul road linking the Santo Niño portal to the Ermitaño haul road, complete approximately 800 m of decline development at Santo Niño, and complete an additional 1,300 m of development in the Ermitaño-to-Navidad ramp and from the Navidad portal.

Figure 4: Proposed Santo Niño and Navidad Portals and Access Development. Plan View (Top) and Orthogonal View Looking North-Northwest (Bottom)

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/1475/302888_5632c92074479b28_005full.jpg

Permitting

The Company has received the permits required for construction of the Santo Niño and Navidad portals, representing a key regulatory milestone in advancing toward underground development activities for the two mineral resources. With these permits now in hand, the Company plans to commence portal construction and related infrastructure work in the second half of 2026.

Summary of Significant Assay Results

A summary of significant assay results from exploration drilling completed at Santo Niño and Navidad during the first half of 2026 are provided in Table 2 and Table 3 below.

Table 2: Summary of Significant Silver and Gold Drill Hole Intercepts at Santo Niño

 Drillhole Target  Target TypeSignificant Intercept  From
(m)To
(m) True Width
(m) Au 
 (g/t) Ag 
 (g/t) AgEq 
 (g/t) SE-25-58Santo Niño VeinResource addition 935.85942.203.180.5863107SE-25-61Santo Niño VeinResource conversion811.00814.803.112.3479255SE-26-62Santo Niño VeinResource conversion201.85205.953.146.31131604
IncludeResource conversion203.35203.850.3827.854772566SE-26-63VeinResource addition 467.20468.751.103.5163326
Santo Niño VeinResource conversion478.55480.101.193.74172452SE-26-65Santo Niño VeinResource conversion197.35204.055.804.04111414
IncludeResource conversion202.30202.750.3911.8993985SE-26-66Santo Niño VeinResource conversion198.65200.751.726.30145617
IncludeResource conversion199.45200.250.6610.832911104SE-26-67Santo Niño Vein 1Resource conversion467.00469.101.611.7660192
Santo Niño Vein 2Resource conversion470.50472.951.882.2317184SE-26-68Santo Niño VeinResource conversion165.60171.054.173.6389361
IncludeResource conversion167.25167.800.4210.84111924SE-26-69Santo Niño Vein 1Resource conversion127.05131.853.682.9632254
IncludeResource conversion129.45130.000.4213.46511061
Santo Niño Vein 2Resource conversion132.80134.201.071.0130106
BrecciaResource addition 192.65197.453.394.3972401
IncludeResource addition 193.20193.550.2519.74781558SE-26-70Santo Niño Vein 1Resource conversion489.15490.551.072.9957282
Santo Niño Vein 2Resource conversion496.30500.853.732.93117337SE-26-71Santo Niño VeinResource conversion156.15157.401.021.54123239SE-26-73Santo Niño VeinResource conversion354.70360.655.395.70120547
IncludeResource conversion356.75357.750.9114.093071363SE-26-74Santo Niño VeinResource conversion178.80184.002.981.4624133SE-26-76VeinResource addition 150.30152.551.592.737212
Santo Niño VeinResource conversion203.70216.905.585.2390482
IncludeResource conversion211.45212.700.5322.993912116SE-26-78Santo Niño VeinResource conversion374.00380.605.063.9259353SE-26-80Santo Niño Vein 1Resource conversion223.90226.902.300.7544100
Santo Niño Vein 2Resource conversion232.05238.004.873.21102342
Santo Niño Vein 3Resource conversion239.75241.301.270.91112180
Santo Niño Vein 4Resource conversion244.05249.204.670.8686150SE-26-82Santo Niño VeinResource conversion365.35377.9010.871.5277191SE-26-84Santo Niño Vein 1Resource conversion220.55227.755.522.1348208
Santo Niño Vein 2Resource conversion229.35234.153.688.46252886
Include 1Resource conversion230.15230.600.3416.603441589
Include 2Resource conversion231.10231.550.3418.614071803
Include 3Resource conversion231.90232.800.6917.235981891SE-26-86Santo Niño Vein 1Resource conversion335.10337.001.466.0791546
IncludeResource conversion336.25336.650.3114.282191290
Santo Niño Vein 2Resource conversion339.15341.201.5715.213331474
IncludeResource conversion340.80341.200.3175.6315907262SE-26-88Santo Niño VeinResource conversion287.50291.452.542.1843206SE-26-90Santo Niño VeinResource conversion160.55162.501.251.7979213SE-26-91Santo Niño VeinResource conversion316.55318.351.1611.521831047
IncludeResource conversion317.00317.450.2937.784533287SE-26-92Santo Niño VeinResource conversion193.55195.801.290.9399168SE-26-93Santo Niño VeinResource conversion356.40366.458.233.3681333
IncludeResource conversion357.95358.650.5722.912872005SE-26-94Santo Niño VeinResource conversion193.50199.703.994.4070400
IncludeResource conversion197.50198.200.4516.891911458SE-26-95Santo Niño VeinResource conversion295.20297.501.881.6078198SE-26-97Santo Niño VeinResource conversion386.15390.703.221.3863167SE-26-99Santo Niño VeinResource conversion320.30325.353.573.90136429
IncludeResource conversion321.80322.350.3915.191481288
IncludeResource conversion324.15324.450.217.1211251660SE-26-100VeinResource addition 775.85777.401.001.0258135SE-26-102-ASanto Niño VeinResource conversion287.25296.906.201.39100205
IncludeResource conversion290.60291.100.3210.924361255SE-26-103Santo Niño VeinResource conversion272.30275.652.740.8274136SE-26-104Santo Niño Vein 1Resource conversion398.15402.052.042.25137306
Santo Niño Vein 2Resource conversion418.85420.101.020.6573121SE-26-105Santo Niño Vein 1Resource conversion299.60301.551.381.8933175
Santo Niño Vein 2Resource conversion310.80313.301.061.448116SE-26-106Santo Niño VeinResource conversion335.45336.951.151.9131174SE-26-108Santo Niño VeinResource conversion415.20416.801.131.25109203SE-26-113Santo Niño Vein 1Resource conversion392.40394.051.064.03112414
Santo Niño Vein 2Resource conversion397.50400.852.152.2742212SE-26-114Santo Niño VeinResource conversion127.40130.151.940.90125192Table 3: Summary of Significant Silver and Gold Drill Hole Intercepts at Navidad

Drillhole Target Target Type Significant Intercept From
(m) To
(m) True Width
 (m) Au
(g/t) Ag
(g/t) AgEq (g/t) EWUG-26-087Winter VeinResource conversion617.50619.001.301.4826137EWUG-26-088Winter VeinResource conversion600.15605.003.4311.993581257
Include 1Resource conversion600.15601.050.6434.287733345
Include 2Resource conversion601.35602.050.4926.055842538
San Nicolas VeinResource addition 732.45736.702.733.1473308EWUG-26-089Winter VeinResource conversion562.65565.302.4923.593592128EWUG-26-091Winter VeinResource conversion601.65617.5014.893.5028291
Include 1Resource conversion603.00603.350.3311.7088966
Include 2Resource conversion605.35605.750.3810.2077843
Include 3Resource conversion607.50608.000.4710.3249823Notes:

All holes are Diamond Drill Core; AgEq grade = Ag grade (g/t) + [Au (g/t) * 75].From and To length indicated in metres, true width of the intercept is calculated per drill hole and vein angles.See Appendix for details regarding drill hole locations, sample type, azimuth, dip and total depth.Significant silver and gold drill hole intercepts were composited using the length weighted averages of uncapped sample assays, a 90 g/t AgEq minimum grade (Cut-off-Grade, "COG") for Santo Niño, and 110 g/t AgEq minimum grade for Navidad; minimum composite length of 1.0 m (true width). A maximum of 1.0 m below the minimum grade cut-off was allowed as internal dilution. Where necessary to achieve minimum length, a single sample below the COG but grading >70g/t AgEq was allowed to be composited for short intervals.Where present, single samples or intercepts with assay results higher than 1000 g/t Ag and/or 10 g/t Au are highlighted as "Include" in each intercept.DATA VERIFICATION

First Majestic's drilling programs follow established Quality Assurance, Quality Control ("QA/QC") insertion protocols with standards, blanks, and duplicates introduced into the sample-stream. After geological logging, all drill core samples are cut in half. One half of the core is submitted to the laboratory for analysis, and the remaining half core is retained on-site for verification and reference purposes or for future metallurgical testing.

Core samples were submitted to the SGS laboratory (ISO/IEC 17025:2017) and to the First Majestic Central laboratory (Central laboratory) (ISO 9001:2015). At SGS, gold is analyzed by 50 g fire assay atomic absorption finish (GE-FAA50V5). Results above 10 g/t gold are analyzed by 50 g fire assay gravimetric finish (GO-FAG50V). Silver is analyzed by 3-acid digest atomic absorption finish (GE-AAS33E50). Results above 100 g/t silver are analyzed by 50 g fire assay gravimetric finish (GO-FAG57V). At Central laboratory, gold is analyzed by 30g fire assay atomic absorption finish (AU-AA13). Results above 10 g/t are analyzed by 30 g fire assay gravimetric finish (ASAG-14). Silver is analyzed by 3-acid digestion atomic absorption finish (AAG-13). Results above 100 g/t are analyzed by 30 g fire assay gravimetric finish (ASAG-14, ASAG-13).

For further information concerning QA/QC and data verification matters, key assumptions, parameters, and methods used by the Company to estimate Mineral Reserves and Mineral Resources, and for a detailed description of known legal, political, environmental, and other risks that could materially affect the Company's business and the potential development of Mineral Reserves and Mineral Resources, see the Company's most recently filed Annual Information Form available under the Company's SEDAR+ profile at www.sedarplus.ca and the Company's Annual Report on Form 40-F for the year ended December 31, 2025 filed with the United States Securities and Exchange Commission on EDGAR at www.sec.gov/edgar.

QUALIFIED PERSONS

Gonzalo Mercado, P. Geo., the Company's Vice-President, Exploration & Technical Services and a "Qualified Person" as defined under National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"), has reviewed and approved the scientific and technical information contained in this news release. Mr. Mercado has verified the exploration data contained in this news release, including the sampling, analytical and test data underlying such information.

ABOUT FIRST MAJESTIC

First Majestic is a publicly traded mining company focused on silver and gold production in Mexico and the United States. The Company presently owns and operates four producing underground mines in Mexico: the Santa Elena Silver/Gold Mine, the Los Gatos Silver Mine (the Company holds a 70% interest in the Los Gatos Joint Venture that owns and operates the mine), the San Dimas Silver/Gold Mine, and the La Encantada Silver Mine, as well as a portfolio of development and exploration assets, including the Jerritt Canyon Gold Mine located in northeastern Nevada, U.S.A, which the Company is currently in the process of re-starting.

First Majestic is proud to own and operate its own minting facility, First Mint, LLC, and to offer a portion of its silver production for sale to the public. Bars, ingots, coins, and medallions are available for purchase online at www.firstmint.com, at some of the lowest premiums available.

FIRST MAJESTIC SILVER CORP.

"signed"

Keith Neumeyer, CEO

Cautionary Note Regarding Forward Looking Statements

This news release contains "forward‐looking information" and "forward-looking statements" under applicable Canadian and U.S. securities laws (collectively, "forward‐looking statements"). These statements relate to future events or the Company's future performance, business prospects or opportunities that are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management made in light of management's experience and perception of historical trends. Forward-looking statements in this news release include but are not limited to statements with respect to: the Company's plans to invest an additional $12 million in 2026 to advance underground access, portal construction, and development work to position Santo Niño for near-term mining; the Company's expectations regarding the impact of the Santo Niño and Navidad vein systems on the future mine plans at Santa Elena; and the Company's planned drilling programs for Santo Niño and Navidad for 2026 and the results of such programs. These statements are not based on a pre-feasibility level study of Mineral Reserves that demonstrate the economic and technical viability of Santo Niño and Navidad. There is increased uncertainty related to the economics of mining Santo Niño and Navidad and increased technical risks of failure associated with a decision to initiate production from these areas prior to completing a pre-feasibility level study. The statements made relating to initiating mining at Santo Niño and Navidad are not based on a current technical report. Assumptions may prove to be incorrect and actual results and future events may differ materially from those anticipated. As such, investors are cautioned not to place undue reliance upon forward-looking statements as there can be no assurance that the plans, assumptions, or expectations upon which they are placed will occur. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives or future events or performance (often, but not always, using words or phrases such as "seek", "anticipate", "plan", "continue", "estimate", "expect", "may", "will", "project", "predict", "forecast", "potential", "target", "intend", "could", "might", "should", "believe" and similar expressions) are not statements of historical fact and may be "forward‐looking statements". Statements concerning proven and probable mineral reserves and mineral resource estimates may also be deemed to constitute forward-looking statements to the extent that they involve estimates of the mineralization that will be encountered as and if the property is developed, and in the case of Measured and Indicated Mineral Resources or Proven and Probable Mineral Reserves, such statements reflect the conclusion based on certain assumptions that the mineral deposit can be economically exploited.

Actual results may vary from forward-looking statements. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause actual results to materially differ from those expressed or implied by such forward-looking statements, including but not limited to: material adverse changes; general economic conditions including inflation risks; labour relations; relations with local communities; changes in national or local governments; exchange rate fluctuations; environmental risks; requirements for additional capital; outcomes of pending litigation; unexpected changes in laws, rules or regulations, or their enforcement by applicable authorities; the failure of parties to contracts with the company to perform as agreed; social or labour unrest; changes in commodity prices; and the failure of exploration programs or studies to deliver anticipated results or results that would justify and support continued exploration, studies, development or operations as well as those factors discussed in the section entitled "Risk Factors" in the Company's most recent Annual Information Form for the year ended December 31, 2025 filed with the Canadian securities regulatory authorities under the Company's SEDAR+ profile at www.sedarplus.ca and in the Company's Annual Report on Form 40-F for the year ended December 31, 2025 filed with the United States Securities and Exchange Commission on EDGAR at www.sec.gov/edgar. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated, or intended.

The Company believes that the expectations reflected in these forward‐looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward‐looking statements included herein should not be unduly relied upon. These statements speak only as of the date hereof. The Company does not intend, and does not assume any obligation, to update these forward-looking statements, except as required by applicable laws.

Cautionary Note to United States Investors

The Company is a "foreign private issuer" as defined in Rule 3b-4 under the United States Securities Exchange Act of 1934, as amended, and is eligible to rely upon the Canada-U.S. Multi-Jurisdictional Disclosure System, and is therefore permitted to prepare the technical information contained herein in accordance with the requirements of the securities laws in effect in Canada, which differ from the requirements of the securities laws currently in effect in the United States. Accordingly, information concerning mineral deposits set forth herein may not be comparable with information made public by companies that report in accordance with U.S. standards.

Technical disclosure contained in this news release has not been prepared in accordance with the requirements of United States securities laws and uses terms that comply with reporting standards in Canada with certain estimates prepared in accordance with NI 43-101.

NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning the issuer's material mineral projects.

APPENDIX - DRILL HOLE DETAILS

Table A1: Drill Hole Collar Location, Sample Type, Azimuth, Dip and Total Depth from Santa Elena

DrillholeEastNorthElevationAzimuthDipDepth (m)TypeSE-25-585821853320633832190-58982CoreSE-25-615818323320637793170-47878.1CoreSE-26-625811773320194770210-52.4250CoreSE-26-635815113320381837192-43.62516CoreSE-26-655811783320194770195-52.71255CoreSE-26-665811793320194770180-51.65224CoreSE-26-675815113320382837201-43.61513CoreSE-26-685810973320166771201-64.96216CoreSE-26-695810973320165771196-49.03273CoreSE-26-705815113320382837187-47.44530CoreSE-26-715810963320166771217-56.95350CoreSE-26-735813053320294814181-46.84387CoreSE-26-745810973320166771238-57.64261CoreSE-26-765810973320167771247-63.94312CoreSE-26-785813053320295813177-51.37417CoreSE-26-805811803320195770207-60.82309CoreSE-26-825813053320295814186-51.67423CoreSE-26-845811793320195770226-56.38294CoreSE-26-865813043320295814202-44.86381CoreSE-26-885814393320175820199-58.8321CoreSE-26-905812643320128778198-54.21193.8CoreSE-26-915814393320175820204-63.47348CoreSE-26-925812653320128778199-63.9233CoreSE-26-935813063320295814197-48.24392CoreSE-26-945812673320128778173-63.73255CoreSE-26-955814383320175820214-54.6333CoreSE-26-975813063320296814208-55.07420CoreSE-26-995814383320175820219-57.65372CoreSE-26-1005820443320613814183-57.341000CoreSE-26-102-A5809723320358748190-43.06339CoreSE-26-1035814403320175820180-55.73387CoreSE-26-1045813063320296814209-59.86462CoreSE-26-1055814403320175820171-60.35393CoreSE-26-1065814403320175820165-65.9399CoreSE-26-1085813073320296814196-59.51459CoreSE-26-1135813073320295814188-56.79444CoreSE-26-1145812933320075777180-57.6207CoreEWUG-26-087583615331950257917665681CoreEWUG-26-088583615331950257919164789CoreEWUG-26-089583615331950257919058879CoreEWUG-26-091583614331950257920352660CoreNotes:

All drill hole collar coordinates are determined using total station equipment after hole completion with UTM WGS84, Zone 12 (metres) as the reference system.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/302888

Source: First Majestic Silver Corp.

Ready to Announce with Confidence? Send us a message and a member of our TMX Newsfile team will contact you to discuss your needs.

Contact Us
2026-06-24 08:52 1mo ago
2026-06-22 07:00 1mo ago
Sierra Madre koupila Del Toro Silver Mine za 20 mil. USD
AG First Majestic Silver
FMP Stock News 85
Original source text
Vancouver, British Columbia--(Newsfile Corp. - June 22, 2026) - Sierra Madre Gold and Silver Ltd. (TSXV: SM) (OTCQX: SMDRF) ("Sierra Madre") and First Majestic Silver Corp. (NYSE: AG) (TSX: AG) (FSE: FMV) ("First Majestic", and together with Sierra Madre, the "Parties") are pleased to announce that, pursuant to the share purchase agreement dated December 17, 2025 (the "Share Purchase Agreement") between Sierra Madre and First Majestic, Sierra Madre has completed its previously announced acquisition (the "Acquisition") of First Majestic Del Toro, S.A. de C.V. ("Subco"), a wholly-owned subsidiary of First Majestic incorporated under the laws of Mexico that holds a 100% interest in the Del Toro Silver Mine ("Del Toro"), as described in further detail in Sierra Madre's and First Majestic's news releases dated December 17, 2025 and Sierra Madre's management information circular dated March 24, 2026 (the "Circular"). All amounts herein are expressed in Canadian dollars, unless otherwise stated in U.S. dollars ("US$").

Alex Langer, Sierra Madre's President and Chief Executive Officer, commented, "The acquisition of Del Toro marks an important step for Sierra Madre Gold and Silver as we advance towards mid-tier silver production. A past-producing asset of this scale is a complementary addition to our Mexico-focused silver portfolio. With existing production infrastructure in place, our focus now turns to near-term resource expansion drilling, with approximately 30,000 metres planned. This program is expected to support an updated Mineral Resource estimate, followed by a potential mine restart, positioning the asset for a return to cash flow generation. We see significant upside at Del Toro, both from resource growth and restart potential. We are excited to get boots on the ground at Del Toro and wish to thank First Majestic for their continued support and trust."

Under the terms of the Share Purchase Agreement, and as further described in the Circular, Sierra Madre acquired all of the issued and outstanding shares of Subco in exchange for a cash payment of US$20,000,000 and the issuance to First Majestic of 10,870,000 common shares of Sierra Madre (the "Common Shares") at a deemed price of $1.30 per Common Share, with each occurring at closing. In addition, within 18 months of closing the Acquisition, Sierra Madre must pay First Majestic US$10,000,000 in cash or, at Sierra Madre's option, Common Shares at a price per Common Share equal to the market price (as determined in accordance with the policies of the TSX Venture Exchange (the "TSXV")) on the day prior to issuance of the Common Shares, subject to a maximum of 10,575,385 Common Shares, provided that if the aggregate deemed value (based on the market price of the Common Shares on the day prior to issuance) of the maximum number of Common Shares does not equal US$10,000,000, the remaining balance will be paid in cash.

The Share Purchase Agreement also sets out the following future milestone-related payments:

if, within 48 months of closing the Acquisition, Sierra Madre files a National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") technical report over any or all of Del Toro that demonstrates "mineral resources" (as defined in NI 43-101) of at least 100 million ounces ("Moz") silver equivalent ("AgEq") or Sierra Madre issues a news release announcing "mineral resources" of at least 100 Moz AgEq (whichever occurs earlier), Sierra Madre must pay First Majestic an additional US$10,000,000 in cash or, at Sierra Madre's option, Common Shares at a price per Common Share equal to the market price (as determined in accordance with the policies of the TSXV) on the day prior to issuance of the Common Shares, subject to a maximum of 10,575,385 Common Shares, provided that if the aggregate deemed value (based on the market price of the Common Shares on the day prior to issuance) of the maximum number of Common Shares does not equal US$10,000,000, the remaining balance will be paid in cash; andif, within 60 months of closing the Acquisition, Sierra Madre achieves commercial production at Del Toro of at least 4,000 tonnes per day ("tpd") for 30 consecutive days, Sierra Madre must pay First Majestic an additional US$10,000,000 in cash or, at Sierra Madre's option, Common Shares at a price per Common Share equal to the market price (as determined in accordance with the policies of the TSXV) on the day prior to issuance of the Common Shares, subject to a maximum of 10,575,385 Common Shares, provided that if the aggregate deemed value (based on the market price of the Common Shares on the day prior to issuance) of the maximum number of Common Shares does not equal US$10,000,000, the remaining balance will be paid in cash.All Common Shares issued to First Majestic in connection with the Acquisition will be subject to a hold period ending on the date that is four months and one day following the date of issuance of the Common Shares. In addition, First Majestic has agreed to the following contractual resale restrictions on all such Common Shares issued:

Release DatesProportion of Total Escrowed Securities to 
be ReleasedDecember 19, 202625%June 19, 202725%December 19, 202725%June 19, 202825%As First Majestic is an insider of the Company, the Acquisition is a "related party transaction" within the meaning of Multilateral Instrument 61-101 Protection of Minority Security Holders in Special Transactions ("MI 61-101"). Sierra Madre relied on the exemption from the requirement of a formal valuation for the Acquisition pursuant to subsection 5.5(b) of MI 61-101 as its Shares are not listed on a specified market. Sierra Madre was not exempt from the minority shareholder approval requirements in MI 61-101, and the Acquisition was approved by a simple majority of the votes cast at the Siera Madre's special meeting of shareholders held on April 28, 2026 excluding, for the purposes of MI 61-101, votes attached to Shares held by First Majestic or any other persons described in items (a) through (d) of Section 8.1(2) MI 61-101. For further details, please refer to the management information circular dated March 24, 2026 available on Sierra Madre's website at www.sierramadregoldandsilver.com and on Sierra Madre's profile on SEDAR+ at www.sedarplus.ca.

Concurrent Financing

Concurrent with the Acquisition, Sierra Madre completed a brokered private placement offering of subscription receipts of Sierra Madre (the "Subscription Receipts") at a price of $1.30 per Subscription Receipt (the "Concurrent Financing") pursuant to an agency agreement dated January 14, 2026 (the "Agency Agreement") among Sierra Madre, Beacon Securities Limited ("Beacon"), as lead agent and sole bookrunner, and a syndicate of agents including Canaccord Genuity Corp., BMO Capital Markets and VSA Capital Limited (together with Beacon, the "Agents").

In connection with the Concurrent Financing, Sierra Madre issued an aggregate of 44,231,300 Subscription Receipts for aggregate gross proceeds of $57,500,690, including the full exercise of the Agents' option, in two tranches: (i) on January 14, 2026, Sierra Madre closed the first tranche and issued 30,521,724 Subscription Receipts for aggregate gross proceeds of $39,678,241; and (ii) on January 30, 2026, Sierra Madre closed the second and final tranche and issued 13,709,576 Subscription Receipts for aggregate gross proceeds of $17,822,449.

Each Subscription Receipt was deemed to be exercised, without payment of any additional consideration, for one Common Share immediately prior to closing of the Acquisition. Sierra Madre used the net proceeds of the Concurrent Financing to fund the completion of the Acquisition and intends to use the remainder of the net proceeds for exploration and development of Del Toro and for general working capital purposes.

Early Warning Disclosure

Pursuant to the terms of the Share Purchase Agreement, upon closing of the Acquisition, First Majestic acquired 10,870,000 Common Shares at a deemed price of $1.30 per Common Share.

Immediately prior to closing of the Acquisition, First Majestic beneficially owned or controlled 51,563,076 Common Shares of Sierra Madre, representing approximately 26.18% of the issued and outstanding Common Shares on a non-diluted basis.

As a result of the Acquisition, First Majestic now beneficially owns or controls a total of 62,433,076 Common Shares representing approximately 24.77% of the issued and outstanding Common Shares as of the date of this news release on a non-diluted basis.

The Common Shares acquired by First Majestic are for investment purposes. First Majestic has no current intention to enter into any of the transactions listed in clauses (a) to (k) of item 5 of Form 62-103F1 of National Instrument 62-103 The Early Warning System and Related Take-over Bid and Insider Reporting Issues ("NI 62-103"), but in the future First Majestic may acquire or dispose of securities of Sierra Madre depending on market conditions, reformulation of plans and/or other relevant factors, in each case in accordance with applicable securities laws.

This news release and First Majestic's corresponding early warning report (the "Early Warning Report"), which is expected to be filed on SEDAR+ in the near term, constitutes the required disclosure pursuant to section 5.2 of National Instrument 62-104 Take-Over Bids and Issuer Bids ("NI 62-104").

The Early Warning Report that will be filed on SEDAR+ will satisfy the requirement of section 5.2 of NI 62-104 to have the Early Warning Report filed by an acquiror, in this case by First Majestic, with the securities regulatory authorities in each of the jurisdictions in which Sierra Madre is a reporting issuer and which contains the information required by section 3.1 of NI 62-103, which includes the information required by Form 62-103F1.

A copy of the Early Warning Report filed by First Majestic in connection with the Acquisition will be available under First Majestic's profile on SEDAR+ website at www.sedarplus.ca.

About Sierra Madre

Sierra Madre Gold and Silver Ltd. is a precious metals development and exploration company focused on the Guitarra mine in the Temascaltepec mining district, Mexico, and the exploration and development of its Tepic property in Nayarit, Mexico. The Guitarra mine is a permitted underground mine, which includes a 500 tpd processing facility that operated until mid-2018 and restarted commercial production in January 2025.

The +2,600 ha Tepic Project hosts low-sulphidation epithermal gold and silver mineralization with an existing historic resource.

Sierra Madre's management team has played key roles in managing the exploration and development of silver and gold mineral reserves and mineral resources. Sierra Madre's team of professionals has collectively raised over $1 billion for mining companies.

On behalf of the board of directors of Sierra Madre Gold and Silver Ltd.,

"Alexander Langer"

Cautionary Note

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this news release.

This press release contains "forward-looking information" and "forward-looking statements" within the meaning of applicable securities legislation. The forward-looking statements herein are made as of the date of this press release only, and the Parties do not assume any obligation to update or revise them to reflect new information, estimates or opinions, future events or results or otherwise, except as required by applicable law. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "expects", "is expected", "budgets", "scheduled", "estimates", "forecasts", "predicts", "projects", "intends", "targets", "aims", "anticipates" or "believes" or variations (including negative variations) of such words and phrases or may be identified by statements to the effect that certain actions "may", "could", "should", "would", "might" or "will" be taken, occur or be achieved. Forward-looking information in this press release includes, but is not limited to, the intended use of proceeds from the Concurrent Financing, Sierra Madre's exploration and development plans for Del Toro, Sierra Madre's general business and growth strategy and the amount of cash and number of shares received as consideration by First Majestic per the milestone payments contemplated under the Share Purchase Agreement.

In making the forward-looking statements included in this news release, the Parties have applied several material assumptions, including that Sierra Madre will have sufficient capital to fund its planned exploration and development activities at Del Toro and that there will be no material adverse changes to applicable laws, regulations or market conditions. Forward-looking statements and information are subject to various known and unknown risks and uncertainties, many of which are beyond the ability of the Parties to control or predict, that may cause Sierra Madre's actual results, performance or achievements to be materially different from those expressed or implied thereby, and are developed based on assumptions about such risks, uncertainties and other factors set out herein, including, but not limited to, changes in commodity prices and general economic, market and business conditions.

Such forward-looking information represents management's best judgment based on information currently available. No forward-looking statement can be guaranteed and actual future results may vary materially. Accordingly, readers are advised not to place undue reliance on forward-looking statements or information.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/302269

Source: First Majestic Silver Corp.

Ready to Announce with Confidence? Send us a message and a member of our TMX Newsfile team will contact you to discuss your needs.

Contact Us